Florida · Climate zone 1–2
Custom House Plans in Miami, FL
Building requirements, permits and zoning in Miami, plus custom plans drawn to meet them. Customization is free and delivery starts at 24 hours.
Start my Miami designWhat's different about building in Miami
- Miami-Dade County is in the High-Velocity Hurricane Zone (HVHZ). Windows, doors and roofing need Miami-Dade Notices of Acceptance (NOA).
- Most coastal lots are in AE or VE flood zones and require elevation certificates.
- Plans typically require sealed structural drawings by a Florida-licensed engineer.
House plans we draw in Miami, FL
Every plan is drawn from scratch for your lot in Miami, FL, with free customization and 30 days of revisions.
Modern farmhouse plans in Miami, FL
Porches, gables and open kitchens, drawn for local codes and HOA rules.
Barndominium plans in Miami, FL
Steel, wood or post-frame shop-houses with RV bays, lofts and porches.
Ranch and single-story plans in Miami, FL
Ready to build one-level homes, from 3 bed 2 bath starters to 4-bedroom split plans.
Craftsman blueprints in Miami, FL
Deep porches and tapered columns that fit historic neighborhoods.
Luxury and contemporary plans in Miami, FL
Executive homes, flat-roof moderns and estates by our Master designers.
Small homes, cottages and ADUs in Miami, FL
Guest houses, garage apartments and affordable starter homes from $1,050.
Engineering stamped blueprints in Miami, FL
Permit-ready sets with a state-licensed engineer stamp add-on.
Building requirements
Building a house in Miami, FL: what the code requires
Statewide residential code
- Building code
- Florida Building Code – Residential applies statewide and is updated on a regular cycle.
- Energy code
- Florida Building Code – Energy Conservation applies statewide.
- Climate zone
- IECC climate zone 1–2. Insulation, windows and HVAC are sized to match.
- Typical frost depth
- 0 in (no frost depth). Footings must extend below the local frost line (confirm with your building department).
- Foundations
- Raised or pier foundations where flood zones apply; slab inland.
- Who can draw the plans
- Single-family homes can generally be designed by a non-licensed home designer. A licensed engineer's stamp is often required for structural items, engineered foundations or special hazard zones, or when the local building official asks for it.
- Engineer stamp
- If your jurisdiction requires sealed drawings, add our Florida Engineer Stamp / Permit-Ready package ($1,500).
Florida-specific rules & hazards
- High design wind speeds statewide. Windborne-debris regions require impact-rated glazing or shutters.
- Building products (windows, doors, roofing) require Florida Product Approval. Miami-Dade and Broward (High-Velocity Hurricane Zone) require a Miami-Dade NOA.
- Flood zones (AE/VE) require elevation certificates, and coastal construction may need a DEP CCCL permit.
- High-wind and hurricane design (uplift connections, impact-rated openings)
- Flood-zone elevation and coastal foundation requirements
Summary for planning only. Codes, editions and local amendments change, so always confirm current requirements with the building department that will issue your permit. Our designers check your jurisdiction before drawing.
Towns, villages & rural counties
Permit checklist for building in Miami and surrounding towns
Requirements differ town by town. Use this checklist with your local building, zoning and health departments, and include what you learn in your design instructions. We'll draw to it.
- 01Find who issues permitsIncorporated towns and cities usually have a building department. In unincorporated areas it's the county building or planning office, or a state agency, or in some rural areas nobody. Call before you buy the lot.
- 02Zoning & setbacksCheck the zoning district for minimum lot size, front, side and rear setbacks, maximum height, lot coverage and whether barndominiums, ADUs or metal buildings are allowed.
- 03HOA & deed restrictionsSubdivisions often restrict minimum square footage, exterior materials, roof pitch, garage orientation and outbuildings. These can be stricter than the town code.
- 04Septic & well permitsWithout city sewer or water, you'll need a percolation (perc) test and a septic permit from the county health department, plus a well permit.
- 05Driveway & culvert permitConnecting to a public road usually needs a driveway or culvert permit from the town, county or state DOT.
- 06Floodplain development permitIf any part of the lot is in a FEMA flood zone, you'll need a floodplain permit and an elevation certificate, and the lowest floor must be at or above the Base Flood Elevation plus any local freeboard.
- 07Energy code complianceMost jurisdictions require an energy compliance report (REScheck or similar) showing insulation, windows and HVAC meet the adopted energy code.
- 08Engineering stampMany building officials require a licensed engineer's seal for foundations, beams, trusses, or high wind, snow or seismic zones. Add our Engineer Stamp option at checkout.
- 09Utility & fire accessRural lots may need a fire-apparatus access road, a water supply for firefighting, or wildfire (WUI) defensible-space and ignition-resistant materials.
- 10Inspections scheduleA typical sequence is footing, foundation, framing, rough MEP, insulation and final. A certificate of occupancy is issued after final inspection.
Popular styles around Miami
Coastal & Beach Plans in Florida
Raised foundations, big porches and breezy layouts built for wind and water.
Mediterranean Plans in Florida
Stucco walls, clay tile roofs, arches and shaded courtyards.
Modern Plans in Florida
Clean lines, flat or shed roofs, floor-to-ceiling glass and indoor-outdoor living.
Miami and Florida house plan guides
- Florida House PlansAffordable House Plans in Florida
- Florida House PlansBarndominium Plans in Florida
- Florida House PlansDuplex Floor Plans in Florida
- Florida House PlansStilt House Plans in Florida
- Florida House PlansModern Farmhouse Plans in Florida
- Florida House PlansReady to Build House Plans in Florida
House plans for sale around Miami
Miami building FAQ
Do I need a building permit to build a house in Miami?+
Yes. New homes in Miami require a building permit from the local building department (city, or county if the lot is unincorporated). Expect to submit a full plan set, a site plan, energy compliance and, where required, sealed engineering.
What building code applies in Miami, FL?+
Florida Building Code – Residential applies statewide and is updated on a regular cycle. Check whether Miami has local amendments before you submit.
How much do custom house plans cost in Miami?+
Plans start at $1,050 for homes up to 1,000 sq ft and are priced by size, with free customization and 30 days of revisions. Engineer stamps for Florida start at $1,500.
Let's design your Miami home
It takes about 10 minutes, and we save your answers as you go.
